Click on photos for larger view
October 2004
View looking west of sequence 10B steel being erected
Lower diaphragms being checked prior to installing in the STG lower casing
South Circ water being set
Cable pulling to switchgear
Metal siding installation on the west intermediate roof
Readings being taken during low diaphragm installation on the STG LP section