| Steam turbine rotor being cleaned prior to re-setting |
|
View looking southwest of platform and lighting installation on stack upper sections |
|
|
|
|
| |
|
Turning vanes being installed in the circulating water inlet structure |
|
|
|
|
|
| View looking northeast of circulating water pipe installation |
|
| Unit 21 boiler feedwater pump shown with power cables prepared for termination |
|
|
|
|
|
|
| View of circulating water pumps and piping |
|
|
|