CTG 21 generator being placed on foundation |
|
 |
|
 |
| |
Unit 22 main transformer being dressed out |
|
|
|
|
|
| Boiler feed pump Unit 22 being positioned with anchor bolts |
|
|
|
|
|
|
|
|
| CW pipe supports & formwork on 21 line wall |
|
|
| Main transformers 20 & 22 oil fill completed & testing underway |
|
|
|
|
|
| Installation of heavy lift system for the STG |
|
| |
|
| CTG 21 lower inlet manifold section & terminal enclosure installed |
|
| CTG 22 collector cabinet being set in position |
|
| CTG 22 transition duct set in position |
|
| Downcomer & steam piping installation on HRSG 21 |
|
| Rebar installation for the floor slab between CTG's |
|
| Final prep for concrete placement elevation 13' |
| |
| |
|
|
| |
| |