Backfilling area North of Heat Recovery Steam Generator (HRSG) 21 |
|
 |
|
 |
| |
|
Concrete placed for condensate pump pit base mat |
|
|
|
|
|
|
| CTG 22 area roof decking completed and inlet filter house support steel installation |
|
|
| Cumbustion Turbine Generator (CTG) 21 west pedastal formwork and rebar (foreground) STG shoring installation (background) |
|
|
| Site looking north from bluff toward the lakefront |
|
|
|
|
| |
|
| Steel erection in sequence 2B and 6b |
|
|
|
|
|
|
| Site from the bluff looking north toward the lakeside of Port Washington |
|
|
| Steel Erection for Pipe Rack North of HRSG 22 |
|
|
|
|
|
|
| STG Shoring Installation and West Pedestal concrete placement |
|
|
| Support Steel for CTG 22 Filter House |
|
|
| |
|
|
|