August 2004
Unit 20 ISO phase bus duct installation
HRSG21 stack being rigged for setting
Slab being placed on STG north & east sides at elevation 49°
Rebar being installed for ammonia tank foundation
Piping installation at 13 elevation west of the STG
Concrete being placed at the ammonia tank foundation
Overhead crane load testing