Aerial Photos Courtesy of Aerialscapes Click on photos for larger view
November 2007
View of power block area looking east.
Aerial view of power block area looking west.
Looking inside the unit 1 boiler.
The coal handling system is now in operation. The system includes 17 miles of new rail road track, a rotary car dumper, four transfer towers, a crusher tower, two outdoor coal piles, a stacker/reclaimer system inside a coal storage building, and approximately 2-1/2 miles of conveyors.