Construction progress continues on the
Unit 2 boiler building just north of Unit 1. |
|
Looking east at the powerblock area. |
|
|
|
|
|
Looking northeast at the boiler building
for Unit 1 and steel erection on Unit 2.
|
|
Unit 1 absorber and wet electrostatic precipitator (WESP). The WESP removes sulfuric acid mist, aerosols and fine particulates from the flue gas. |
|
|
|
|
|
| Unit 1 and common area progress looking southeast. |
|
Unit 2 construction progress looking east. |
|
Looking northeast at the powerblock area.
|
|
|
|
| |
|
Looking into the Unit 1 boiler
building.
|
|