| Unit 1 boiler building |
|
Unit 1 boiler building and turbine pedestal. To the left is the start of Unit 2 structural steel. |
|
|
|
Securing the rotary car dumper into place |
|
| Unit 1 absorber inlet duct set in place |
|
|
|
|
|
|
|
| Preparing to lift the rotary car dumper |
|
Lifting the rotary car dumper into place |
|
|
|
|
|
| Lifting the rotary car dumper into place |
|
Concrete placement of Unit 2 electric switchgear building deck |
|
|
|
|
|
| Assembling the coal conveyor system |
|
|
|