| Looking east at the structural steel for the boiler buildings. Unit 1 is to the right of Unit 2. |
|
To the left of the Unit 2 boiler steel, you can see the turbine floor with the generator stator in place. |
|
|
|
|
|
View of the power block area.
|
|
View of an incoming materials barge for unloading. |
|
|
|
|
|
| Looking east at the structural steel for the boiler buildings. Unit 1 is to the right of Unit 2. |
|
Construction work inside the circulating water pump house. |
|
|
|
|
|
| View of Unit 2 from the east. |
|
View of the coal conveyor
section that will fuel the
existing Oak Creek Power Plant
units.
|
|