|
|
|
|
| On July 24, five rail cars of coal were unloaded and piled through the stackout in a successful test of the new coal-handling system. |
|
Coal being stacked out on the new outdoor coal storage pile. |
|
|
|
|
|
View of the power block area.
|
|
Looking east at the structural steel for the boiler buildings. Unit 1 is to the right of Unit 2. |
|
|
|
|
|
| Looking east at the structural steel for the boiler buildings. Unit 1 is to the right of Unit 2. |
|
View of the power block area. |
|
|
|
|
|
| View of Unit 1. |
|
|
|