|
|
|
|
| Unit 1 & Unit 2. |
|
Power block area. |
|
|
|
|
|
Looking north you can see the boiler
building for Unit 1 and the shared chimney. |
|
Coal handling facility and switchyard. |
|
|
|
|
|
Rail car dumper under construction and
the coal transfer tower. |
|
Power block and dock extension. In the
future, the dock will be used for storage
of
limestone and gypsum. |
|
|
|
|
|
| Looking northeast you can see the turbine foundation construction. |
|
Looking northwest, you can see the
Unit 1 boiler building and chimney for both units. The chimney is 550 ft. |
|
Looking east at the powerblock area.
|
|
|
|
| |
|
Structural steel of the boiler
building for Unit 1 reached its
height of 280 ft. in March 2007. |
|